Should you weld your next DDA handrail?

In this sections we will compare many different aspects of railing installation and maintenance.

Installation

Kee Klamp Railing Traditional Welded Rail
Specialised Labor No, Simple to Install Yes, Professional Labor Union Employee
Time Typically it would take 2 people 8 hours to install 30m. of railing. Varies on availability and skill level.
Special Permits None Hot Permit Required
Safety Factor Use of simple tools such as drill, hammer, and allen wrenches. Welding creates a greater potential for bodily harm.
Overall Costs After the consideration of all factors you can save up to 50% when installing a Kee Klamp component railing over a welded rail solution.  

Maintenance

Kee Klamp Railing Traditional Welded Rail
Breakage The systems modular components allow for the broken section to be replaced by loosening the surrounding fittings and replacing the broken fittings and pipe. A professional welder must replace the affected section
Rust The Kee Klamp system components are galvanised or anodized to resist corrosion. Kee Klamps railing are known to last for 20 years without showing the least bit of rust. Because galvanisation is removed during the installation processes, welded connections and ground fixings are known to show rust under a two year period.

Compliance

Kee Klamp Railing Traditional Welded Rail
DDA Use of our DDA (Kee Access) Handrail System combines smooth surface and is designed specifically to meet the requirements of DDA, Building Regulations Part M and BS 8300, weldless system. Welding used to be the only way of providing an DDA smooth surface railing.
EU Directive When installed properly railings built with our fittings meet EU standards. Can be constructed to EU Specification