Quick and easy
KeeGuard installation

easy-assembly-2

No drilling

No drilling, special anchoring or penetration of the roof membrane.

Easy to Assemble

No specialist tools

No welding, bending or threading required on site, and no speciality tools are needed.

Guardrail

Quick installation

A team of 2 people can install up to 100m a day.

Simplicity

Easy to DIY

Minimum components for ease of fitting and installation.

Stage 1

Starting at least 2m away from the roof edge at the corner, stand up the two support legs.

KeeGuard installation step by step

Stage 2

Place a Main Rail Tube (8610) into the bottom Saddle Clamp (135-8) of each of the standing legs.

Position the tube so there is at least 60mm protruding from the Saddle Clamp (135-8) and tighten the Grub Screw. These are located on the front of the Saddle Clamp (135-8).

Place the second Main Rail Tube (8610) into the top Saddle Clamp (135-8), positioning the tube as before, leaving at least 60mm of the tube protruding from the Saddle Clamp (135-8) and tighten the Grub Screw of the Saddle Clamp (135-8).

KeeGuard installation step by step

Stage 3

Form a corner via connecting 2No 90º Elbows (15-8) to one end of each of the Main Rail Tubes (8610).

Position a further Support Leg (3m max – EN 13374) (2.4m max – EN 14122-3) from the corner.

Slide a Main Rail Tube (8610) into the bottom Saddle Clamp (135-8) and 90º Elbow (15-8).

Slide a Main Rail Tube (8610) into the top Saddle Clamp (135-8) and 90º Elbow (15-8).

Tighten the grub screws of all clamps.

KeeGuard installation step by step

Stage 4

Working in pairs carefully lift the assembled bay and walk towards the leading edge.

Carefully place the bay in the desired position and slide the corresponding Counter Weight tube into the Base Foot.

CBT1 (Intermediate Support Leg) or CBT2 (Free Standing End Detail). Always ensure the bay is being held in position whist carrying out this part of the assembly.

At corner Support Legs there is no need for a PVC Counter Weight to be connected.

KeeGuard installation step by step

Stage 5

Intermediate support Legs/PVC Counter Weights Slide 1No. Cantilever Tube (CBT1) into the Base Foot.

Do not tighten at this stage.

Place 1No. Collar (74-7) in the front slot of the PVC Counter Weight. Slide 1No. PVC Counter Weight on to the free end of the Cantilever Tube (CBT1).

Line and level guardrail.

Tighten all grub screws.

KeeGuard installation step by step

Stage 6

Working away from the corner slide a Straight Coupling (14-8) on to the top and intermediate Main Rail Tubes.

Position the clamp so the grub screws are facing outwards and tighten the Grub Screw at the connected end.

Stand up the next Support Leg at the desired position (3m max – EN 13374) (2.4m max – EN 14122-3).

Continue with this method of fitting the Main Rail Tube (8610) and Support Legs together for this run of guardrail, remembering to connect the intermediate Cantilever Tubes (CBT1) and PVC Counter Weights (440-7) to the Support Legs as you proceed.

KeeGuard installation step by step

Stage 7

Free Standing End Details (refer to tables below)


EN 13374

Slide 1No. Two Socket Cross (26-7) on to the free end of the Cantilever Tube (CBT2).

Do not tighten at this stage.

Slide 2No. Small Cantilever Tubes into the free ends of the Two Socket Cross (26-7) and tighten the grub screws holding these tubes into position.

Place 1No. Collar (74-7) in the front slot of each PVC Counter Weight.

Slide 1No. PVC Counter Weight on to the free end of the Cantilever Tube (CBT2).

Slide 1No. PVC Counter Weight on to each of the free ends of the Small Cantilever Tube (CBT3).


EN 14122-3

Slide 2No. Two Socket Cross (26-7) on to the free end of the Cantilever Tube (CBT2).

Do not tighten at this stage.

Slide 4No. Small Cantilever Tubes into the free ends of each of the Two Socket Cross (26-7) and tighten the grub screws holding these tubes into position.

Place 1No. Collar (74-7) in the front slot of each PVC Counter Weight.

Slide 1No. PVC Counter Weight on to each of the free ends of the Small Cantilever Tube (CBT3).

Position all PVC Counter Weights as far from the Base Foot (130-875) as practically possible.

Line and level guardrail.

Tighten all grub screws. (See Fixed, Free Standing and intermediate Details).


WARNING

Under no circumstances should any person be anchored to the system for fall arrest purposes.

Further, components such as timber infill, advertising boards, polyethylene sheets must not be fixed to the system.

KeeGuard installation step by step

KeeGuard installation step by step

KeeGuard installation step by step




Product Guides

KeeGuard brochure

Read about the KeeGuard components, technical specs and see our installation tips.



Shopping Basket

Show Pricing

Option available in footer.